Owen Delany Park Stadium and Sports Lighting
The Owen Delany Stadium hosts national and regional sporting events. Xyst were engaged to specify the stadium lighting for televised events and the lower rugby fields to semi-professional lighting standards. The project was procured by Xyst under an open tender and design build methodology. Project management was provided by Taupo District Council with Xyst performing […]
Harbour Facilities Officer Secondment
Xyst provided staffing resource on a secondment to cover a vacant position at the Thames-Coromandel District Council. During the 11 months Xyst was engaged, staff managed the District’s boat ramps and wharves. This included overseeing a boat ramp pass system, engaging with commercial tour operators and fishing vessels, managing part-time wharf staff and responding to […]
Taumarunui-Ōhura Ward Reserves
Parks Development and Maintenance Plan Xyst visited each park and reserve in the Ward to collect park asset data and to map the current and recommended future maintenance activity. We then described and priced both short and long-term improvement actions to enhance reserve utilisation, while reducing ongoing maintenance and capital costs, which was provided in […]
Parks and Playgrounds gap analysis and performance assessment
Xyst undertook an open space performance and asset gap analysis covering: Development of an agreed level of service standard for the BBS parks and open spaces, based on their hierarchy and types. Conducted a comprehensive gap analysis providing an overview of each park within Baw Baw Shire, highlighting discrepancies between the current assets at each […]
Project Management of City ‘Gateway’ Sculpture
Xyst worked closely with mana whenua to understand their aspirations and ensure these were in alignment with Waka Kotahi’s parameters. Xyst supported the artist and ensured tikanga processes were followed throughout the duration of the project. We worked closely with mana whenua to understand the significance of the site and meaning of the sculpture. We […]
Playground Renewal Plan
Xyst worked with the client’s internal parks team developing their playground levels of service to support Council’s future strategic direction. A report was provided outlining the service levels and recommendations to support future funding applications and to address current gaps in service levels within the next 5 years. Developed levels of service to guide the […]
Purser Grove Reserve Development
Concept Plan Development and Procurement Xyst developed the final concept plan to enable Council to independently appoint the main landscape construction contractor – who was engaged to interpret the concept plan into a construction-ready set and provide landscape construction services. Xyst acted as Engineer to the Contract for Council during the hard and softscape construction […]
Pōmare Park Development – Stage 1
Procurement and Project Management Xyst procured a suitable construction contractor via a competitive tender process and appointed them under a 3910 Construction Contract. Xyst also prepared the Resource Consent application and gained consent for the required earthworks. Xyst liaised with the contractor throughout the construction period, from contract issue in mid-March 2024 through to project […]
Kevin Collier
Kevin brings a unique and extensive mix of skills and experience to his role as Principal Sport and Recreation Consultant at Xyst. His chosen ‘career-for-life’ in the sport, recreation and events industry includes significant roles in the rebuilding of Christchurch’s sport facility infrastructure as well as playing a part in securing and hosting major sports […]
Lake Tekapo Township Rabbit Control
The Mackenzie District Council engaged Xyst to coordinate rabbit control in the Lake Tekapo township following a Notice of Direction from Environment Canterbury (ECAN). Xyst began by procuring a suitable contractor for the operation, reaching out to multiple qualified operators for pricing. Staff then requested a detailed operational plan and conducted a site visit to […]
Meadow Bank Reserve Development
Procurement for Stormwater and Recreational Improvements. Xyst worked with Hutt City park officers and stormwater engineers to procure a revised stormwater improvement design and subsequently, a construction contractor, to commence site works in June 2024. Xyst also developed a revised landscape concept plan for recreational improvements – including a new accessible track, providing greater access […]
Streets for People Concept Development Plan
Xyst worked with the project team, and engaged with key stakeholders in the development of a series of landscape concept plans for key sites within the project area that included painted street planters and planting, footpath and electrical box murals, and the inclusion of additional seating and rest areas that connect with adjacent green spaces […]