Trails
The development and management of trails gives people access to wonderful natural environments and promotes outdoor activity and exercise. Planning a trail is a complex process which needs to consider the needs of stakeholders, minimises the impact on the environment, has clear, concise signage that doesn’t create visual pollution, along with many other factors.
We account for all those factors when we develop a plan for the development or maintenance of a trail, engaging stakeholders and setting responsive actions to get the project finished.
As a result, we have been involved in many trail projects, delivering better quality trails which cater for changing trends, the growth of cycling, and which make trails more useful as year-round attractions.
if we can help you deliver a project
Our expertise
- Trail Strategies
- Trail Feasibility Studies
- Trail Signage Audits
- Trail Way Finding Strategies
- Trail Observation Studies
- Trail Intercept Surveys
- Trail Performance Assessments
Related Team
Related Projects
Eastern Hills Tracks
Network Assessment, Recommendations and Signage Plan Xyst physically inspected the full network of Eastern Hills Tracks in Hutt City Council to inform a track signage
Twizel Man Made Hill Development
The Twizel Community requested the transformation of “Man Made Hill”, an untidy mound of spoil from the Ministry of Works days. In response, Xyst crafted
Track Asset Review
Undertook a detailed trail assessment of all Ruapehu District Council (RDC) managed trails using Xyst’s trail assessment system and against HB8630:2004. An individual assessment report
Regional Trails Master Plan – The Tracks and Trails of Western Australia’s Wildflower Country and Coast
Western Australia’s Tracks and Trails – Wildflower Country and Coasts. Xyst broke the project down into specific tasks made up of: 1. Market Analysis Baseline
Omokoroa to Tauranga Cycle Trail survey 2020
The Xyst survey team collected a total of 200 intercept and online surveys over a period of a week that gave our client (Western Bay
Bass Coast Tracks and Trails Strategy
This strategy identified 36 new trail opportunities to expand the trail network that has been identified during the development of this strategy, (emerging from background
Parks & Facilities Management
Xyst was brought on board after a thorough risk and performance evaluation of the Mackenzie District Council’s parks and community facilities operations. Xyst was then
Swan Canning Riverpark (WA) Parks User Survey
Xyst measured visitor expectations of levels of service by asking them to rate the importance of various park features. These results were compared with visitor
Asset & Facility Risk Assessments
New councillors were worried about the risks posed to their community, so the Mackenzie District Council engaged Xyst to perform a risk assessment on a
Wairarapa Five Towns Trail Network Masterplan
In 2017 the Wellington Regional Trails Framework was endorsed by the partners who initiated it and contained in the framework is a key recommendation to
Coastal Pacific Trail Feasibility Assessment (The Whale Trail)
We provided field route assessment, feasibility and cost estimations services for the development of the feasibility assessment
Glacier Country Cycle Trail Feasibility Study
Xyst worked alongside Tourism Resource Consultants to deliver a feasibility report outlining a proposed cycle and walking trail between Okarito and Fox Glacier that would
Asset Condition Assessment & Valuation
Xyst was engaged to undertake Asset Collection work on behalf of the Mackenzie District Council, where we used a mobile GIS data collection tool to
Trail Signage at Whataupoko Park
Xyst developed a wayfinding signage plan in consultation with the Gisborne MTB Club. This project included: • consultation with immediate neighbours • development of a
Open Space and Street Furniture Guidelines
The Open Space and Street Furniture Guidelines is a suite of three resources: Practice Notes (this document) – 4 practice notes (people, place, environment, economy)
Gender Impact Assessment, Warburton Mountain Bike Destination Project
Yarra Ranges Council is committed to working towards a Yarra Ranges where everyone has equitable access to resources, power and opportunities. This commitment is documented
Contract Performance Auditing
Nelson City Council engaged Xyst to carry out contract performance auditing. Xyst has developed an inspection template using a mobile app that allows performance against
Trail Survey
In early 2022 Yarra Ranges Council engaged Xyst to undertake a performance assessment of three shared use trails: the Lilydale Lake Trail, the Lilydale to
Yardstick Parks User Surveys
Yardstick Parks User Surveys were developed in around 2008 initially as a paper based intercept survey designed to target park users and measure satisfaction with
The Tracks and Trails of WA’s Wildflower Country and Coast
Xyst delivered a Regional Trails Master Plan that was sufficient to enable Western Australia’s constituent councils to give due consideration to the strategic aspects of
Eltham Lower Park Wayfinding Audit
Xyst developed an audit to identify the existing signage placed within the Eltham Lower Park and adjoining areas. This existing signage included signs directing people
Trails Strategy 2021
Xyst undertook a comprehensive audit and assessment of the Shires diverse trail network with emphasis on user experience. Alongside the audit, Xyst provided mapping analysis
Kauaeranga Valley Trail Needs Assessment
For preparation of the assessment Xyst undertook a review of current strategic documents, recreation participation, current trail provision, demographics and projections, the tourism setting and