Trail Survey
In early 2022 Yarra Ranges Council engaged Xyst to undertake a performance assessment of three shared use trails: the Lilydale Lake Trail, the Lilydale to Warburton Rail Trail, and the Yarra Valley Trail. This was a follow-up to an earlier survey carried out in 2019. Performance assessments were conducted in March 2022 using the Yardstick […]
Yardstick Parks User Surveys
Yardstick Parks User Surveys were developed in around 2008 initially as a paper based intercept survey designed to target park users and measure satisfaction with a range of parks related services and features. The product was initially called Parkcheck and is still known as this by some users. The surveys were taken online in 2015 […]
Parks Performance Assessments
The purpose of the parks performance assessment was to identify the strengths and weaknesses of each park, from a multi-faceted holistic perspective, and particularly from the users’ perspective. Recommendations to retain, change or assign (where none previously existed) service classifications for each park were made.
Shade Audit of Open Spaces
Xyst provided a qualitative assessment of existing shade throughout the network and completed a current condition assessment for structural shade infrastructure. Analysis was provided to assist the Council to determine the current and future needs for shade within the facilities, and objective recommendations were made based on results and findings of the audits.
Pakipaki Church Conservation Feasibility Study
Xyst undertook a feasibility study to determine whether the building could be restored and then for the sustainability of the restored building to remain in sound condition for those activities to be held within and associated to the original Church.
Otaraua Multi-Purpose Circuit Needs and Feasibility Assessment
Xyst undertook a Needs and Feasibility study on a proposed multi-purpose circuit, unique to New Zealand due to design specifications meeting the international speed skating requirements whilst also meeting cycling, walking and running event requirements. Assessing the need, Xyst considered the population in the catchment and the growth predictions, the number of potential users given […]
Child Care Centre Playground Performance Assessment
Key findings of the performance assessments, accompanied by some high level analytical commentary was completed, with each playground assigned an overall performance assessment score. Analysis included site design, play value, quantity of play items, equipment condition, safety surface condition and an assessment of remaining life of the asset.
Playground Performance Assessment
Undertook an assessment of each playground using the Playable Space Assessment Tool, Play England 2009, which has been adapted by Xyst. The tool enabled an assessment to be made of location, play value and ancillary facilities to produce an overall percentage score for each playground, ranking each playground to enable priorities to be identified objectively […]
Recreation Facilities Utilisation Study
The Xyst team undertook an assessment of the sport and recreation facilities across the Ashburton District, providing key provisions including a gap analysis and trend overview for 17 different sport and recreation activities. To support the analysis, we met with different sport and recreation clubs across the district to understand utilisation of their current facilities, […]
Botanic Garden Education Program
Xyst analysed the current education program that Geelong Botanic Gardens was using and created an issues and opportunities report. The report identified a number of issues and opportunities, fundamentally identifying a lack of strategic direction for the program. It was recognised that a business plan was needed to address many of the key issues. The […]
Play Strategy Review and Open Space Quality Assessments report
Xyst undertook park quality performance assessments on all City of Greater Geelong owned or managed community parks and other open space types. We were also asked to review the Geelong Play Strategy 2012-2020 and produce a report around how well the city implemented the strategy and advice on strengths, weaknesses, lessons learnt and any significant […]
Rural City of Murray Bridge – Water-Based Recreation Management Plan
Xyst developed the Management plan to help RCMB identify opportunities for rejuvenation along the Murray River Corridor, encompassing future potential for residential land uses and sustainable environmental management. Xyst participated in inception and research and consultation and assessments to deliver a final management plan. From this Xyst identified opportunities and constraints relating to a broad […]